MDW2 East Dock — Bathroom Makeover

Filmed throughout the makeover process while embedded alongside the renovation team, documenting the space from its original condition through active construction and the completed transformation.

The project required coordinated access to the work area during renovation, allowing the transformation to be documented from inside the process rather than simply capturing the finished result.

Previous

MDW7’s Largest Donation — St. Jude House